Grandview Reservoir Upgrades

Service & Expertise:

Skills Needed:

Year:

2018

LOCATION:

Surrey, BC

CLIENT

Metro Vancouver

Project Description:

Metro Vancouver retained Water Street to prepare a pre-design report evaluating the options for expansion of the Grandview Reservoir in Surrey. The pre-design included assessing various configurations for the proposed Cells 3 & 4 to meet the forecasted build-out for the Grandview area. Water Street prepared three options for the configuration of the cells including supply and discharge piping configurations, valve chamber arrangement, construction sequencing and phasing of the upgrades. Class C capital costs opinions and life cycle cost assessments  were prepared for the options.

A critical constraint of the project was consideration of requirements for a deep 1200 mm dia. reservoir outlet to the Grandview Pump Station between the existing reservoir (Cell 1) and the site property line. Property impacts (both the City’s property and public roads), temporary working easements, statutory ROWs, permanent easements for pipes, the working width required to construct the deep excavations, and protection & support of existing structures (particularly the reservoir) were considered and costed.

Consulting Team:

Project Lead, Civil, and Mechanical Design:

Water Street

Electrical:

PBX Engineering

Structural:

Gygax Engineering Associates

Geotechnical:

Thurber Engineering

Grandview Pump Station

10-m wide corridor between MV Grandview Reservoir Cell 1 and the City of Surrey’s works yard property line, seen in photo and cross-section views